Sticking to the composites industry leader
Jiangsu Food and Drug Administration Supervision Project
The total land area of the project of Jiangsu Food and Drug Administration Supervision Project is 13,475m2, with 9 floors of buildings and 2 partial floors. A frame-shear wall structure is adopted to set up a basement full of halls. The area of the foundation pit is about 8350m2, the perimeter is about 390m, and the excavation depth is about 6.05 ~ 6.95m. The safety level of the foundation pit is Grade II, and the importance coefficient is 1.0.
Category:
Construction
Consult
DESCRIPTION
The total land area of the project of Jiangsu Food and Drug Administration Supervision Project is 13,475m2, with 9 floors of buildings and 2 partial floors. A frame-shear wall structure is adopted to set up a basement full of halls. The area of the foundation pit is about 8350m2, the perimeter is about 390m, and the excavation depth is about 6.05 ~ 6.95m. The safety level of the foundation pit is Grade II, and the importance coefficient is 1.0. Foundation pit support scheme. The foundation pit uses φ800 @ 1000 bored cast-in-situ piles and a layer of concrete support. The outside uses φ700 @ 500 biaxial cement-soil mixing pile as a water-proof curtain
Project Application Type:
Support Engineering-maintenance of pile
characteristic: corrosion resistance